We acquired Block 46 Cai Nuoc from Repsol in January 2022 as part of the same acquisition which included three Malaysia PSCs and the PM3 CAA PSC. It lies adjacent to PM3 CAA and oil produced from Block 46 Cai Nuoc flows into the PM3 CAA facilities.
Asset Name:
Block 46 Cai Nuoc PSC
Licence:
Block 46 Cai Nuoc Production Sharing Contract
Hibiscus Petroleum’s Interest:
70%
Operator:
Talisman Vietnam Limited*
Non-operating Partner:
PetroVietnam Exploration Production Corporation Ltd.
Asset Location:
Offshore Vietnam
Water Depth:
56m
Field Life Cycle:
Production
Producing Fields:
Cai Nuoc
Development Type:
Tie-back to PM3 CAA facilities
Acquisition Completion Date:
24 January 2022
Office Location:
Kuala Lumpur
*Operator name to be changed
Note: * Talisman Vietnam Limited is undergoing a name change. The legal entity is currently part of Hibiscus Petroleum pending the name change.
NOTES:
1 For the financial year ended 30 June 2024.
2 As at 1 July 2024, based on FIPC Group’s current estimated net entitlement, as per RPS Energy’s report dated August 2023 and adjusted for actual production during the 12 months ended 30 June 2024.
3 LTIR represents the frequency of lost time injuries (LTI), which includes fatalities, permanent disabilities or workhours lost due to workplace incidents, per 200,00 hours worked by both employees and contractors.